Construction Site Activities
Monday - Friday 8:15am - 4:30pm
No experience necessary. Training and mandatory safety orientation and equipment are provided.
Tasks include:
- Forming, pouring and finishing concrete curbs and sidewalks
- Pouring the foundation footings and foundation walls
- Placing the foundation drainage system and waterproofing the foundation walls
- Preparing, pouring and finishing the basement floors
- Constructing the first floor deck
- Framing the walls and second floor deck
- Installing trusses and closing in the roof
- Installing windows
- Installing the electrical, plumbing and heating systems
- Insulating the exterior walls
- Hanging siding
- Hanging drywall
- Painting
- Hanging doors and installing trim
- Installing laminate flooring
- Cosmetic details that complete house aesthetics
- Cleaning the site and organizing the tool and materials storage areas
Sign Up Today!